
OPERATIONS ORDER
Operation Fault Line (2018), Friend in Need
TO:
OPERATIONS OFFICER
United Task Force
UNITAF Forces Yemen
OPERATIONS OFFICER
United Task Force
UNITAF Forces Yemen
FROM:
Lt Gen Chad P. Franks
CMDR CJTF USCENTCOM
MacDill Air Force Base Tampa, U.S.
Lt Gen Chad P. Franks
CMDR CJTF USCENTCOM
MacDill Air Force Base Tampa, U.S.
--- OPERATIONS ORDER ---
Situation
Background InformationYFF forces have been holding their position for a while but are unable to make any progress. Archer platoon is tasked with clearing out Zarath; this valley will ease pressure on their frontline up north by cutting off the main supply route from Kalaenoowi and spreading the IS frontline thinner.
Friendly Forces
1x motorised platoon 1x M1240A1 mk. 19 (HQ) 2x M1237 (0-GPK/M2) 2x M1239 AUV (LOGI)
Supporting Assets
YFF is fighting in the hills, don't expect any support from them however. USAF at Kinduf airbase can be called up to prevent mission failure.
Enemy Forces
Standard insurgent forces consisting off PATROL CAMPS in hilly terrain, STATICS, (V)IEDs, OFFROAD TECHNICALS, small number of APCs/IFVs.
Mission
Tasking- Aid civilians by delivering supplies. - Neutralise hostile forces in Zarath. (secondary) -Destroy caves exits.
End-state
After gaining control of Zarath, endex in the field.
Execution
Commander's IntentSimply, the intent of this operation is to provide support/ relief to the YNA frontline whilst securing an important valley in the run-up to KalaeNoowi and providing some humanitarian relief to local civpop.
Tasks and Sequencing
Phase 1 Archer platoon will proceed from our staging area mounted up via the marked route to Dismount Cheddar (primary) or Brie (secondary) if we reach contact before primary. From dismount, infantry will proceed to their designated civilian area- Archer 1 to Civ A and Archer 2 to Civ B. Humanitarian aid to be provided and we will touch base with the civpop to see if there's any intel or requirements they have. Phase 2 Phase 2 will consist of the beginning of valley clearance- using marked sectors and assigning them on an as-needed basis, with the general layout of Archer 1 left flank of approach/ South and West, and Archer 2 on the right flank/ North and East. Phase 3 For the final planned phase we will continue our movement N/W through the valley, acting upon any targets of opportunity in the hills West/ East of the valley as well as at the N/W end. Multiple strongholds and cave entrances have been spotted by recon/ intel and will need to be checked and cleared if hostile.
Administration/Logistics
ResupplyIn accordance with SOP
Medical
In accordance with SOP
Rules of Engagement
In accordance with SOP
Fire Support Plan
In accordance with SOP
Close Air Support
In accordance with SOP
Command/Signal
Communications Plan
| Callsign | Primary Frequency | Superior Frequency | ACTUAL |
|---|---|---|---|
| ARCHER 9 | 40mHz | 37mHz | MSP Mattjamco Platoon Commander (≤32) |
| ARCHER 1 | 250mHz | 40mHz | SP3 Shahid-e-Gomnam (Ret. PH) Squad Leader (≤15) |
| ARCHER 2 | 260mHz | 40mHz | Cpl Gendalorf Squad Leader (≤15) |
| CASTLE 4 | 70mHz | 43mHz | SP1 Yoi Blackkit Logistics Support Chief |
In accordance with SOP
CONNECTION INSTRUCTIONS
TEAMSPEAK IP: ops.unitedtaskforce.netGAME SERVER IP (Direct Connect): ops.unitedtaskforce.net
GAME SERVER PASSWORD: issued on Discord
TIMINGS
SERVER OPENS: 1830hrs UTCFORM UP: 1900hrs UTC
ANNOUNCEMENTS/BRIEFING: 1915hrs UTC
STEP OFF: 1925hrs UTC
END-EX: 2100-2200hrs UTC APPROX
All are GMT/UTC